AD 2 AERODROMES

VOBZ

VOBZ AD 2.1 AERODROME LOCATION INDICATOR AND NAME

VOBZ - VIJAYAWADA AIRPORT, VIJAYAWADA

VOBZ
AD 2.2

AERODROME GEOGRAPHICAL AND ADMINISTRATIVE DATA

1

Aerodrome reference point coordinates and its site

163201N 0804812E

MAG. BRG. 72.04 DEG/1498M from

physical beginning of RWY 08

2

Direction and distance of aerodrome reference point from the center of the city or town which the aerodrome serves

085 DEG, 23KM from Vijayawada City.

3

Aerodrome elevation and reference temperature

83 FT / 40.3 DEG C

4

Magnetic variation, date of information and annual change

1.25 DEG W (2010) /0.017 DEG E

5

 

 

 

 

Name of aerodrome operator, address, telephone, telefax, e-mail address, AFS address, website (if available)

Airport Director

Airports Authority of India

Vijayawada Airport

Gannavaram (Andhra Pradesh) - 521102,

 

Telephone:

(91) 8662846729

(91) 9441902480

Fax:

(91) 866 28546757

AFS:

VOBZYDYX VOBZYHYX

Email:

apd_vobz@AAI.AERO

6

Types of traffic permitted (IFR/VFR)

IFR/VFR

7

Remarks

Elevation in EGM 08

VOBZ

AD 2.3

OPERATIONAL HOURS

1

Aerodrome Operator

MON-FRI 0400-1230 UTC (0930-1800 IST)

SAT, SUN+ HO: NIL

2

Custom and immigration

As ATS (See remarks No. 2)

3

Health and sanitation

Available within AD hours

4

AIS briefing office

As ATS

5

ATS reporting office (ARO)

As ATS

6

MET Briefing office

As ATS

7

Air Traffic Service

Consult NOTAM for Current ATS HR.

8

Fuelling

As ATS

9

Handling

As AD Administration.

10

Security

As ATS

11

De-icing

NIL

12

Remarks

(i) Outside of ATS hour’s services are available O/R with 24 HR PN to AD.

(ii) Customs and immigration facilities are available during flight schedule. 72-hour prior notice for any non-scheduled operations.

(iii) The ATS approved hourly RWY traffic handling capacity as follows:

Maximum number of arrivals and departures -12

Maximum number of arrivals only -06

Maximum number of departures only -10

VOBZ

AD 2.4

HANDLING SERVICES AND FACILITIES

1

Cargo-handling facilities

Common User Domestic Cargo

Terminal Available

2

Fuel and Oil types

JET A1

3

Fuelling facilities and capacity

HPCL (85KL), BPCL (75 KL) & IOCL (93 KL)

4

De-icing facilities

NIL

5

Hangar space for visiting aircraft

Nil

6

Repair facilities for visiting aircraft

Nil

7

Remarks

NIL

VOBZ

AD 2.5

PASSENGER FACILITIES

1

Hotel(s) at or in the vicinity of aerodrome

In the city

2

Restaurant(s) at or in the vicinity of aerodrome

At AD and in the city

3

Transportation possibilities

Buses, Taxis and Car hire AVBL

4

Medical Facilities

First aid at AD. Hospitals in the city.

5

Bank and post office at or in the vicinity of

aerodrome

Banks: Nil

Post office: Nil

6

Tourist office

A.P. Tourist Information counter AVBL in AD.

7

Remarks

NIL

VOBZ

AD 2.6

RESCUE AND FIRE FIGHTING SERVICES

1

Aerodrome category for fire fighting

Within ATS HR: CAT-7

2

Rescue equipment

AVBL as per category.

3

Capability for removal of disabled aircraft

1. The critical aircraft for the airport is A321.

2. Primary responsibility for removing disabled aircraft rests with the concerned airline.

3. The airlines may contact Airport Director for coordinating with the agencies for Disabled Aircraft Recovery Kit.

4. Contact Details of Airport Director:

0866-2846729, +91-9441902480

apd_vobz@aai.aero

 

4

Remarks

NIL

VOBZ

AD 2.7

SEASONAL AVAILABILITY CLEARING

1

Type(s) of clearing equipment

NIL

2

Clearance priorities

NIL

3

Remarks

NIL

VOBZ

AD 2.8

APRONS, TAXIWAYS AND CHECK LOCATIONS/POSITIONS DATA

1

Designation, surface and strength of aprons

Refer Aircraft Parking/Docking Chart.

2

Designation, width, surface and strength of

taxiways

Refer Aircraft Parking/Docking Chart

 

Designator: TWY N

3

Location and elevation of altimeter checkpoints

Location:TWY A: 163147.21N 0804750.10E

Elevation 76FT

4

Location of VOR checkpoints

TWY A, 163146.83 N 0804750.19 E, 78FT

TXY B, 163144.84 N 0804740.73 E, 76FT

TXY N, 163207.93 N 0804856.79 E 60FT

TXY D

5

Position of INS checkpoints

NIL

6

Remarks

1. Coordinates of RWY Holding Position

TWY Coordinates Elevation (FT)

TWY A 163147.2167N 0804750.1079E 78

TWY B 163145.2179N 0804740.6442E 76

TWY D 163149.6302N 0804801.5150E 73

TWY N 163207.551N 0804856.8789E 60

 

2. Coordinates of RWY & Taxi Intersection

TWY Coordinates Elevation (FT)

TWY A 163150.4075N 0804749.3923E 80

TWY B 163148.4202N 0804739.9344E 76

TWY D 163152.7823N0804800.7811E 76

3. Dimension:

Apron-I : 412 X 166.5 M

Apron-II : 106 X 76 M

Apron-III : 255.5 X 174 M

 

4. Isolation Bay:

i. Location: North of RWY 8/26 at 524 m from beginning

of Runway 26

ii. Dimension: 110 M X 120 M

iii. Critical Aircraft: A321

iv. Coordinates: 163214.897 N 0804855.22 E

v. Elevation: 60 ft

vi. Parking Orientation: Facing North, Power-in/Power out

vii. Surface and Strength: Concrete, 85/R/B/W/T

 

5. Elevation in EGM 08

VOBZ

AD 2.9

SURFACE MOVEMENT GUIDANCE AND CONTROL SYSTEM AND MARKINGS

1

Use of aircraft stand identification signs, taxiway guidelines and visual docking/parking guidance system at aircraft stands

Taxiing guidance provided on R/T,

Guidelines at Apron

2

Runway and taxiway markings and lights

RWY Markings : Designation, THR, TDZ, Centreline, Edge, End

RWY Lights : THR, Edge, End

TWY Marking : Centreline, Holding Position & Edge

TWY Lights : Edge on TWY A, TWY B, TWY N and TWY D

RWY Guard on TWY D

RWY Guard Lights : AVBL on TWY A,B,D and N

3

Stop bars (if any)

Nil

4

Remarks

NIL

VOBZ

AD 2.10

AERODROME OBSTACLES

In Approach/Take-off/Circling Area and at AD

1

2

3

4

5

6

RWY/Area affected

Obstacle type

Coordinates

Elevation

(EGM-08)

Marking/LGT

Remarks

26/TKOF

08/APCH

OTHER

163149.1N

0804720.9E

91 FT

NO

Mobile Road Traffic

(Road Elev. 22.7m+5m

Traffic Height)

26/TKOF

08/APCH

OTHER

163149.0N

0804719.6E

92 FT

NO

Mobile Road Traffic

(Road Elev. 23.0m+5m

Traffic Height)

26/TKOF

08/APCH

POLE

163148.4N

0804717.9E

107 FT

NO

Electric Pole

26/TKOF

08/APCH

POLE

163147.5N

0804716.7E

108 FT

NO

Electric Pole

26/TKOF

08/APCH

OTHER

163142.7N

0804715.5E

101 FT

LGTD

LC Rod on Localizer

26/TKOF

08/APCH

TREE

163144.8N

0804714.2E

102 FT

NO

Group of TreesGroup of Trees

26/TKOF

08/APCH

POLE

163137.8N

0804715.8E

100 FT

NO

Light Pole

26/TKOF

08/APCH

OTHER

163143.0N

0804714.1E

100 FT

NO

Mobile Road Traffic

(Road Elev. 25.5m+5m

Traffic Height)

26/TKOF

08/APCH

POLE

163144.3N

0804713.3E

106 FT

NO

Electric Pole

26/TKOF

08/APCH

TREE

163146.2N

0804712.0E

105 FT

NO

Group of Trees

26/TKOF

08/APCH

TREE

163142.4N

0804710.9E

109 FT

NO

Group of Trees

26/TKOF

08/APCH

TREE

163136.4N

0804711.9E

111 FT

NO

Group of Trees

26/TKOF

08/APCH

POLE

163136.1N

0804711.2E

119 FT

NO

Light Pole

26/TKOF

08/APCH

POLE

163136.8N

0804710.4E

118 FT

NO

Light Pole

26/TKOF

08/APCH

TREE

163137.8N

0804709.9E

113 FT

NO

Group of Trees

26/TKOF

08/APCH

TREE

163135.9N

0804708.6E

118 FT

NO

Group of Trees

26/TKOF

08/APCH

TREE

163133.5N

0804703.8E

125 FT

NO

Group of Trees

26/TKOF

08/APCH

TREE

163137.0N

0804659.7E

141 FT

NO

Group of Trees

26/TKOF

08/APCH

OTHER

163053.2N

0803922.9E

634 FT

NO

Hill Top

26/TKOF

08/APCH

SIGN

163136.3N

0804710.9E

111 FT

NO

Sign Board

(International)

26/APCH

08/TKOF

OTHER

163214.0N

0804918.1E

68 FT

NO

Mobile Road Traffic

(Road Elev. 15.7m+5m

Traffic Height)

In circling area and at AD

BUILDING

163142.5N

0804739.9E

102 FT

NO

Customs Building

In circling area and at AD

OTHER

163141.7N

0804737.1E

157 FT

LGTD

Antenna On ATC

(ATC Building Top -

42.4m)

In circling area and at AD

OTHER

163141.6N

0804737.1E

148 FT

LGTD

ATC Beacon Top

(ATC Building Top -

42.4m)

In circling area and at AD

TREE

163138.6N

0804733.1E

150 FT

NO

Group of Trees

In circling area and at AD

TREE

163137.2N

0804722.7E

142 FT

NO

Group of Trees

In circling area and at AD

POLE

163149.3N

0804718.9E

106 FT

NO

Electric Pole

In circling area and at AD

TREE

163150.7N

0804717.9E

133 FT

NO

Group of Trees

In circling area and at AD

TREE

163136.7N

0804718.1E

133 FT

NO

Group of Trees

In circling area and at AD

TREE

163148.8N

0804714.0E

134 FT

NO

Group of Trees

In circling area and at AD

OTHER

163137.7N

0804716.3E

100 FT

NO

Mobile Road Traffic

(Road Elev. 25.6m+5m

Traffic Height)

In circling area and at AD

TREE

163134.7N

0804714.0E

151 FT

NO

Group of Trees

In circling area and at AD

POLE

163135.7N

0804712.1E

118 FT

NO

Light Pole

In circling area and at AD

TREE

163147.7N

0804655.9E

136 FT

NO

Group of Trees

In circling area and at AD

OTHER

163142.5N

0804734.8E

88 FT

LGTD

Wind Vane

In circling area and at AD

BUILDING

163209.9N

0804902.8E

64 FT

LGTD

New GP Hut Without

Antenna

In circling area and at AD

OTHER

163209.9N

0804903.0E

102 FT

LGTD

LC Rod on GP Antenna

(Antenna Top Elev.

30.3m)

In circling area and at AD

OTHER

163210.4N

0804905.5E

73 FT

LGTD

LC Rod on GP Monitor

Antenna

(Antenna Top Elev.

21.9m)

In circling area and at AD

OTHER

163210.4N

0804905.5E

72 FT

LGTD

New GP Monitor

Antenna

In circling area and at AD

OTHER

163209.9N

0804903.1E

99 FT

LGTD

New GP Antenna

In circling area and at AD

OTHER

163210.0N

0804902.9E

74 FT

NO

New GP DME Antenna

In circling area and at AD

OTHER

163208.7N

0804916.8E

55 FT

NO

Approach Light

In circling area and at AD

TREE

163204.7N

0804927.7E

82 FT

NO

Group of Trees

In circling area and at AD

BUILDING

163202.3N

0804826.9E

76 FT

LGTD

GP Hut (Old)

In circling area and at AD

OTHER

163204.5N

0804836.0E

80 FT

NO

Mobile Road Traffic

(Road Elev. 19.3m+5m

Traffic Height)

In circling area and at AD

OTHER

163202.3N

0804902.3E

80 FT

NO

WDI

In circling area and at AD

OTHER

163202.8N

0804905.9E

82 FT

NO

MET Antenna

In circling area and at AD

OTHER

163145.3N

0804743.8E

107 FT

NO

MET Antenna

In circling area and at AD

OTHER

163144.8N

0804745.1E

94 FT

LGTD

WDI

In circling area and at AD

TREE

163200.2N

0804801.0E

126 FT

NO

Group of Trees

In circling area and at AD

BUILDING

163201.4N

0804810.2E

106 FT

NO

Temple

In circling area and at AD

TREE

163201.6N

0804810.3E

140 FT

NO

Group of Trees

In circling area and at AD

TREE

163203.6N

0804820.2E

132 FT

NO

Group of Trees

In circling area and at AD

BUILDING

163202.8N

0804821.9E

92 FT

NO

Temple

In circling area and at AD

BUILDING

163203.9N

0804823.0E

105 FT

NO

Building

In circling area and at AD

TREE

163204.5N

0804823.6E

131 FT

NO

Group of Trees

In circling area and at AD

TREE

163204.0N

0804826.7E

119 FT

NO

Group of Trees

In circling area and at AD

BUILDING

163205.1N

0804826.9E

111 FT

NO

Building

In circling area and at AD

WALL

163203.2N

0804827.0E

78 FT

NO

Airport Boundary Wall

with Fencing on Top

In circling area and at AD

BUILDING

163203.7N

0804827.7E

101 FT

NO

Pillar On Temple

(Temple Top 29.5m)

In circling area and at AD

POLE

163204.2N

0804829.2E

90 FT

NO

Electric Pole

In circling area and at AD

TREE

163204.8N

0804829.5E

108 FT

NO

Group of Trees

In circling area and at AD

TREE

163206.9N

0804839.2E

103 FT

NO

Group of Trees

In circling area and at AD

BUILDING

163210.0N

0804844.0E

128 FT

NO

Building

In circling area and at AD

POLE

163208.1N

0804846.6E

86 FT

NO

Electric Pole

In circling area and at AD

TREE

163158.8N

0804852.5E

73 FT

NO

Group of Trees

In circling area and at AD

BUILDING

163206.6N

0804827.4E

124 FT

NO

Building

In circling area and at AD

BUILDING

163205.8N

0804824.8E

122 FT

NO

Building

In circling area and at AD

BUILDING

163204.0N

0804828.2E

85 FT

NO

Watch Tower

In circling area and at AD

OTHER

163231.8N

0804823.7E

251 FT

LGTD

Cellphone Mast

In circling area and at AD

OTHER

163722.0N

0804440.3E

655 FT

NO

Hill Top

In circling area and at AD

OTHER

163056.3N

0803926.2E

692 FT

LGTD

Mast on Hill

In circling area and at AD

OTHER

163045.7N

0803859.0E

920 FT

LGTD

Mast on Hill

In circling area and at AD

OTHER

163045.7N

0803859.2E

792 FT

NO

Hill Top

In circling area and at AD

OTHER

163045.3N

0803858.8E

812 FT

LGTD

Mast on Hill

In circling area and at AD

OTHER

163044.8N

0803859.4E

892 FT

LGTD

Mast on Hill

In circling area and at AD

OTHER

163925.1N

0804541.3E

710 FT

NO

Hill Top

VOBZ

AD 2.11

METEOROLOGICAL INFORMATION PROVIDED

1

Name of the associated meteorological office

AMO Vijayawada

2

Hours of service and, where applicable, the designation of the responsible meteorological office outside these hours

H24

3

Office responsible for preparation of TAFs and periods of validity and interval of issuance of the forecasts

Hyderabad

9 HR (00-09,03-12,06-15 and 09-18)

4

Availability of the trend forecast for the aerodrome and interval of issuance

NIL

5

Information on how briefing and/or consultation is provided

As ATS

 

6

Types of flight documentation supplied and language(s) used in flight documentation

Tabular form English

7

Charts and other information displayed or available for briefing or consultation

NIL

8

Supplementary equipment available for providing information on meteorological conditions, e.g. weather radar and receiver for satellite images;

RVR Equipment and Digital Current Weather Instrument System (DCWIS)

Equipment for RWY 26 And 08 available.

 

 

9

The air traffic services unit(s) provided with meteorological information

Vijayawada ATC and ACS

10

Additional information, e.g. concerning any limitation of service.

NIL

VOBZ

AD 2.12

RUNWAY PHYSICAL CHARACTERISTICS

Designations

 

TRUE Bearings

Dimensions of RWY (M)

Strength of pavement

(PCN) and associated

data) and surface of runway and associated stopways

Geographical

coordinates for

threshold and

runway end

1

2

3

4

5

08

77.75 DEG

3360 x 45 M

90/F/B/W/T

Asphalt

THR:

163146.32N

0804729.94E

RWY END:

163208.28N

0804914.80E

26

257.75 DEG

3360 x 45 M

90/F/B/W/T

Asphalt

THR:

163208.28N

0804914.80E

RWY END:

163145.09N

0804724.08E

THR elevation

and highest

elevation of

TDZ of

precision APP

RWY

Slope of

runway and

associated

stopway

Dimensions of

stopway

(M)

Dimensions of

clearway

(M)

Dimensions of

strips

(M)

6

7

8

9

10

THR: 80.7FT

TDZ: 80.7FT

-0.26%

NIL

NIL

3480 x 280 M

THR: 54.8FT

TDZ: 71.2FT

0.26%

NIL

NIL

3480 x 280 M

Dimensions of

runway end

safety areas

Location and

description of

arresting system

(if any)

Existence of an

obstacle-free

zone

Remarks.

11

12

13

14

240M x 90M

 

---

1. RWY 08 PCN

0 to 1663 M 90/F/B/W/T

1663M to 2286M 99/F/B/W/T

2286M to 3360M 71/F/B/W/T

2. All elevations in EGM08

150M x 90M

 

---

1. RWY 26 PCN

0 to 1074 M 71/F/B/W/T

1074M to 1697M 99/F/B/W/T

1697M to 3360M 90/F/B/W/T

2. All elevations in EGM08

VOBZ

AD 2.13

DECLARED DISTANCES

RWY Designator

Take-off

run

available

TORA

(M)

Take-off

distance

available

TODA

(M)

Accelerate

distance

available

ASDA

(M)

Landing

distance

available

LDA

(M)

Remarks

(including runway

entry or start point

where alternative

reduced declared

distances have

been declared)

1

2

3

4

5

6

08

3360

3360

3360

3182

THR Displaced by 178M

26

3360

3360

3360

3360

 

VOBZ

AD 2.14

APPROACH AND RUNWAY LIGHTING

Runway

Designator

Type, length and

intensity of

approach lighting

system

Runway threshold

lights, colour and

wing bars

Type of visual

slope indicator

system

Length of runway

touchdown zone

lights

1

2

3

4

5

08

SALS

420 M

LIH

Green

PAPI

LEFT/3.00 DEG

 

26

SALS

420 M

LIH

Green

PAPI

LEFT/3.00 DEG

 

Length, spacing,

colour and

intensity of

runway centre line

lights

Length, spacing,

colour and

intensity of

runway edge lights

Colour of runway

end lights and

wing bars

Length and colour

of stopway lights

Remarks

6

7

8

9

10

 

3360 M

60 M

White

LIH

Red

 

NIL

 

3360 M

60 M

White

LIH

Red

 

NIL

VOBZ

AD 2.15

OTHER LIGHTING, SECONDARY POWER SUPPLY

1

 

Location, characteristics and hours of operation of aerodrome beacon/identification beacon (if any)

ABN

At Tower Building, FLG W&G EV2SEC

As ATSAt Tower Building, FLG W&G EV2SEC

IBN

NIL

2

 

Location and lighting (if any) of anemometer/landing direction indicator;

LDI

255M East of ATS Tower,not lighted

Anemometer

86M West of ATC Tower,not lighted

3

 

Taxiway edge and taxiway centre line lights;

Edge

AVBL for TWY ‘A,B, D and N’

Centre Line

NIL

4

Secondary power supply including switch-over time;

Secondary Power supply to all lighting at AD. Switch-over time Zero sec (UPS available)

5

Remarks

NIL

VOBZ

AD 2.16

HELICOPTER LANDING AREA

1

Geographical coordinates of the geometric centre of touchdown and lift-off (TLOF) or of each threshold of final approach and take-off (FATO) area

Not established

2

TLOF and/or FATO area elevation:

Not established

3

TLOF and FATO area dimensions to the nearest metre or foot, surface type, bearing strength and marking;

Not established

4

True bearings of FATO;

Not established

5

Declared distances available

Not established

6

Approach and FATO lighting;

Not established

7

Remarks

Not established

VOBZ

AD 2.17

AIR TRAFFIC SERVICE AIRSPACE

1

Airspace designation, geographical

coordinates and lateral limits

CTR: Circular area centered on 163201N 0804812E within a 15NM radius.

2

Vertical limits

FL 65

3

Airspace classification

D

4

Call sign and language(s) of the air

traffic services unit providing service;

Vijayawada Tower, English

5

Transition altitude

4000 FT

6

Hours of applicability

HO

7

Remarks

NIL

Vijayawada Approach Control Unit is combined with Vijayawada

Aerodrome Control Tower.

VOBZ

AD 2.18

AIR TRAFFIC SERVICES COMMUNICATION FACILITIES

Service Designation

 

Call sign

 

Channel(s)

 

SATVOICE Number(s),

if available

 

1

2

3

4

APP

Vijayawada Tower

118.550 MHZ

 

APP

Vijayawada Tower

118.650 MHZ

 

TWR

Vijayawada Tower

118.550 MHZ

 

TWR

Vijayawada Tower

118.650 MHZ

 

ATIS

Vijayawada Information

128.400 MHZ

 

ALRS

EMERG FREQ

121.500 MHZ

 

Logon

address, as

appropriate

Hours of operation

 

Remarks

 

5

6

7

 

HO

1. Main Frequency

2. Functions of TWR & APP are combinedApproach Control Service provided by Aerodrome Control Tower

 

 

1. Backup Frequency

2. Functions of TWR & APP are combinedApproach Control Service provided by Aerodrome Control Tower

 

As ATS

1. Main Frequency.

 

 

AS ATS

Alternate Frequency

 

As ATS

NIL

 

AS ATS

NIL

VOBZ

AD 2.19

RADIO NAVIGATION AND LANDING AIDS

Type of aids, magnetic variation and type of supported operation for ILS/MLS, basic GNSS, SBAS and

GBAS, and for

VOR/ILS/MLS station

used for technical lineup of the aid

Identification

Frequency(ies),

Channel number(s),

Service provider, and

reference path

identifier(s) (RPI), as

appropriate

Hours of operation, as

appropriate;

1

2

3

4

LOC 26

CAT I

IVJA

109.500 MHz

AS ATS

GP 26

IVJA

332.600 MHz

AS ATS

DME ILS 26

IVJA

CH32X

 

DVOR/DME

BBZ

116.200 MHz

CH109X

H24

Geographical

coordinates of the

position of the

transmitting

antenna

Elevation of

transmitting

antenna of

DME/

elevation of

GBAS

reference point

Service volume radius

from the GBAS

reference point

Remarks

5

6

7

8

163143.3N

0804715.5E

 

 

 

163209.9N

0804903.1E

 

 

 

163209.9N

0804903.1E

74 FT

 

1. Elevation in EGM08

2. Colocated with GP 26

 

163215.8N

0805008.2E

73 FT

 

Vertical datum: EGM08

 

VOBZ

AD 2.20

LOCAL AERODROME REGULATIONS

1. PUSHBACK AND TAXI PROCEDURES

i. Aircraft parked on stands 2,3,4, can push back in both directions east or west and taxi out via taxiway D and

B respectively. Aircraft parked on stands 14,15,16,17 shall pushback facing west only. Aircraft parked on

apron III (stands 19 to 24) can pushback in both directions east or west and taxi out via taxiway D and B respectively.

ii. Simultaneous push back from apron III and any of the stands from 14 to 17 is permitted.

iii. Simultaneous push back from any of the stands from 2 to 4 and any of the stands from 14 to 17 is permitted.

iv. Simultaneous push back from apron III and any of the stands from 2 to 4 are not permitted.

v. Taxiway A and Apron II not available for Operations.

2. No Aircraft shall make lock turn/ pivotal turn on the Runway to avoid pavement damage.

LOW VISIBILITY PROCEDURES

1. INTRODUCTION:

Low Visibility Procedures (LVP) at Vijayawada Airport (VOBZ) are established to ensure the safe and efficient operation of aircraft during conditions of reduced visibility, in accordance with DGCA Civil Aviation Requirements, ICAO Annex 14, and the approved local Standard Operating Procedures.

Low Visibility Procedures at Vijayawada Airport (VOBZ) are applicable only to Category I (CAT I) operations and are established to facilitate take-off operations below the standard Category I take-off reference of 550 m RVR, as permitted under DGCA CAR Section 8, Series C, Part I. Due to the non-availability of runway centre line lights, take-off operations at this aerodrome are restricted to a minimum RVR of 400 m.

2. DEFINITIONS:

2.1 ILS Critical Area: An area of defined dimensions about the localizer and glide path antennas where aircraft and vehicles are excluded during all ILS operations. The critical area is protected because the presence of vehicles / or aircraft inside its boundaries will cause unacceptable disturbance to the ILS signal-in-space.

2.2 ILS Sensitive Area: An area extending beyond the ILS critical area where the parking and/or movement of vehicles, including aircraft, are controlled to prevent the possibility of unacceptable interference to the ILS signal during ILS operations. The sensitive area Airports is protected to provide protection against interferences caused by large moving objects outside the critical area but still normally within the airfield boundary.

2.3 Low Visibility Procedures (LVP): Specific procedures applied at an aerodrome for the purpose of ensuring safe operations during Categories II and III approaches and/or low visibility take-offs.

Note: as per para 5.3 of CAR on All Weather Operations, an operator shall not conduct Take-off with RVR/Visibility less than standard CAT-I conditions of 550m RVR/800m Visibility unless low visibility procedures are enforced.

2.4 Manoeuvring Area: That part of an aerodrome to be used for the take-off, landing and taxiing of aircraft, excluding aprons.

2.5 Movement Area: That part of an aerodrome to be used for the take-off, landing and taxiing of aircraft, consisting of the manoeuvring area and the apron(s).

2.6 Runway Visual Range: The range over which the pilot of an aircraft on the centre line of a runway can see the runway surface markings or the lights delineating the runway or identifying its centreline.

2.7 Safeguarding Procedures: Safeguarding Procedures (SP) are instructions for relevant airport departments and airside operators to prepare ground services and facilities for low visibility operations, in order that when LVP are implemented all SP are complete and airport is configured for Low Visibility Procedures and Low Visibility Take-offs.

2.8 Missed approach procedure: - The procedure to be followed if the approach cannot be continued.

2.9 Aerodrome Operating Minima- The limits of usability of an aerodrome for:

a) take-off, expressed in terms of runway visual range and / or visibility and, if necessary, cloud conditions.

b) landing in 2 D instrument approach operations, expressed in terms of visibility and/or runway visual range; minimum descent altitude/height (MDA/H) and, if necessary, cloud conditions; and

c) landing in 3D instrument approach operations, expressed in terms of visibility and/or runway visual range and decision altitude/height (DA/H) appropriate to the type and/or category of the operation.

2.10 Touchdown Zone- The portion of a runway, beyond the threshold, where it is intended landing aeroplanes first contact the runway.

2.11 Visibility- Visibility for aeronautical purposes is the greater of:

a) the greatest distance at which a black object of suitable dimensions, situated near the ground, can be seen and recognized when observed against a bright background.

b) The greatest distance at which lights in the vicinity of 1000 candelas can be seen and identified against an unlit background.

Note 1. The two distances have different values in air of a given extinction coefficient, and the latter b) varies with the background illumination. The former a) is represented by the meteorological optical range (MOR).

Note 2. The definition applies to the observations of visibility in local routine and special reports, to the observations of prevailing and minimum visibility reported in METAR and SPECI and to the observations of ground visibility.

3. ABBREVIATIONS:

ADC: Aerodrome Control

ARFF: Airport Rescue and Fire Fighting Services

ATC: Air Traffic Control

ATM: Air Traffic Management

CFT: Crash Fire Tender

ATIS: Automatic Terminal Information Service

DG: Diesel Generating Set

LVP: Low Visibility Procedures

MET: Meteorology

OPS: Operations

RWY: Runway

RVR: Runway Visual Range

SMC: Surface Movement Control

SP: Safeguarding Procedures

TDZ: Touchdown Zone

TMO: Tower Metrological Officer

TWY: Taxiway

4. LOW VISIBILITY PROCEDURES:

4.1 Regulations: CIVIL AVIATION REQUIREMENT SECTION 8 - AIRCRAFT OPERATIONS SERIES ‘C’ PART I ISSUE II, DATED 28TH OCTOBER 2022:

An operator shall not conduct take-off with RVR/visibility less than standard Category I conditions of 550m RVR/800 m visibility unless low visibility procedures are enforced.

An operator shall not conduct low visibility take-offs in less than 400 m RVR unless approved by DGCA. Operators may be authorized LVTO minima of up to 75m. Foreign operators, who are authorized by their State Regulatory Authority for LVTO, shall submit requisite documents to DGCA for approval of LVTO at Indian aerodromes.

5. GENERAL:

5.1 Low visibility procedures have been developed for Vijayawada Airport, Vijayawada to accommodate/permit departures in visibility/RVR less than 800M/550M from RWY 26 beginning (runway served with touchdown zone RVR instruments).

5.2 The Low Visibility Procedure (LVP) incorporates safeguarding measures to mitigate runway incursions and defines operational restrictions to ensure safe Airside Operations taking into account the available Aerodrome facilities.

6. MINIMUM REQUIREMENTS:

6.1 The following Aeronautical Ground lights and RVR equipment shall be serviceable to the required standards to support Low Visibility Procedures:

a) Runway edge lights,

b) Runway end lights,

c) Runway Guard Lights (available on TWY ‘A’, ‘B’, ‘D’ and ‘N’)

d) Instrument RVR (Available for TDZ Runway 08/26).

e) Stand by Power supply to maintain switch over time of 1 Second for Runway

Edge Lights and Runway End Lights. This requirement can be met with the help of DG Set and/or UPS.

6.2 Unserviceability of Aeronautical Ground Lights/ Equipment before Implementation of LVP.

6.2.1 Low Visibility Procedures will not be implemented when any of the light/equipment mentioned in para 6 above is un-serviceable or is not maintained as per the required standard.

 

Aeronautical Ground
Lighting Facility
Un-serviceability
Restrictions
Runway Edge lights
More than 5% of all lights are
unserviceable
LVP operations will be
suspended.
Any two consecutive lights or
more are unserviceable
Runway End lights
More than 15% of all lights are
unserviceable
LVP operations will be
suspended.
Any two consecutive lights or
more are unserviceable
Standby Generators/UPS
Any of the generator/UPS is
unserviceable
LVP operations will be
suspended.
Note: When any of the light/equipment mentioned in para 6 above becomes un- serviceable or fails to meet the required standard during periods of LVP, Tower shall advise the aircraft accordingly and LVP shall be suspended and information to this effect shall be included in ATIS broadcast.
6.3 Runway 08/26 beginning (full length) only will be used for departures under LVP.
6.4 Only one aircraft movement at a time shall be permitted in the movement area when the RVR is less than 550 metres.
6.5 Due to the non-availability of Runway Centre Line lights, take-off operations are restricted to a minimum RVR of 400 m.
7. EQUIPMENT AND SERVICES
7.1 Equipment
a) DCWIS (Digital Current Weather Indication System) at Runway 08/26.
b) FSM (Forward Scatter Meter) at Runway 08/26.
c) RVR is reported in the following scales:
i) The maximum reportable value of RVR is 2000 m. When RVR is above 1500 m, it is reported as 2000 m.
ii) In the increments 100 m when greater than 800 m.
iii) In the increments 50 m when RVR greater than 400 m but less than 800 m.
iv) In the increments 25 m when less than 400 m.
d) In case of unserviceability of the above metrological equipment’s, the LVP shall be suspended.
7.2 ILS
7.2.1 Runway 26 is equipped with CAT I ILS.
8. SAFEGUARDING PROCEDURES
8.1 Safeguarding Procedures (SP) are instructions for relevant airport, departments and airside operators to prepare ground services and facilities for low visibility operations in order that when LVP are implemented all Safeguarding procedures are complete.
8.2 Safeguarding Procedures shall be initiated when-
a) The Visibility/RVR is less than 1200m and visibility/RVR is forecast to deteriorate to 800m or less; and/or
b) The cloud ceiling is less than 400ft and forecast to fall to 200ft or less.
8.3 Safeguarding procedures include-
a) Positioning of CFTs as per Visibility Standby procedures.
b) Stopping of all maintenance works on the manoeuvring area, ILS sensitive and critical area as removal of all men and mobile equipment from the said area.
c) Ensuring availability of secondary power supply for change over time of maximum one second for Runway Edge and Runway End lights supported by UPS.
d) The appropriate Aeronautical ground lights must have been inspected during the hour preceding implementation of LVP, and thereafter once every two-hour period. These lighting inspections should be accorded priority and, if necessary,
aircraft operations may be delayed.
e) The mandatory serviceability requirements of the Aerodrome Ground Lightings (AGLs) system shall be maintained as per CAR Section 4, Series B, Part I, Para 10.5.11, through inspection by Follow-Me with Electrical personal and reporting to ATCO prior to each departure when the RVR is less than 550 metres.
Note- Runway Edge and Runway End lights may continue to operate on main power supply during safeguarding Procedures. Whenever, LVP is to be implemented as per para 9 below, the Runway Edge and Runway End lights shall be put on Standby Power Supply (DG set or UPS). This operation needs to be completed before LVP is implemented. In case of DG set, Main power supply shall act as stand by power. If UPS is capable of maintaining the required AGL system with one second of Switch Over time with Main Supply, the main supply can continue to be primary supply and the Generator Supply can be kept as Stand by Power supply.
f) Operations department shall ensure that all runway access roads are closed.
8.4 Process of initiation of Safeguarding Procedures-
a) When meteorological conditions meet the criteria for initiation of SP as stipulated in Para 8.2, the Tower Supervisor/Duty Officer will initiate and co- coordinate with CCR, SSO (CNS), Duty Manager (Airside) and Fire Station for completion of safeguarding procedures before implementation of Low Visibility Procedures.
b) When all the CCR, SSO (CNS), Duty Manager (Airside) and Fire Station have completed their necessary actions, they shall report to Tower Supervisor/Duty Officer that their Safeguarding Procedure (SP) is completed, and the airport is safeguarded for LVP operations.
9. LOW VISIBILITY OPERATIONS
Low Visibility Procedures are the procedures to ensure the safe operation of aircraft during periods of reduced visibility or low cloud base. LVP shall only be implemented when Safeguarding Procedure (SP) has been completed, and the airport is configured for low visibility operations.
9.1 Implementation of Low Visibility Procedures-
a) Whenever Visibility/RVR reduces to 800 Meters or below and/ or cloud ceiling is at 200 ft or below the Tower Supervisor/Duty Officer shall coordinate with CCR, SSO (CNS), Duty Manager (Airside) and Fire Station to confirm whether the Safeguarding procedures have been completed or not.
b) Once, it is confirmed that Safeguarding Procedures are implemented and LVP is necessitated, the Tower Supervisor/Duty Officer will implement Low Visibility Procedures and shall inform CCR, SSO (CNS), Duty Manager (Airside) and Fire Station of the imposition of low visibility procedures.
9.2 Actions by Tower Controller
a) Whenever visibility/RVR is less than 800M/550M, Tower shall confirm from pilot that the reported RVR value is within minima before issuing take-off clearance.
b) Tower shall ensure that the towing of aircraft is done under escort of “Follow Me” vehicles. “Follow Me” shall inform ATC of any deviation from the route cleared by ATC.
c) Tower shall not permit any high-power ground run on the manoeuvring area except idle power run on the stands.
d) In case high power engine run-up is in progress, the same shall be stopped whenever RVR reduces below 550m and towed back to respective stand.
e) Tower shall ensure that “Follow Me” services are provided to pilots on request.
f) The number of vehicles on the manoeuvring area shall be restricted to bare minimum and records of all operating on the manoeuvring area shall be maintained by Tower.
g) Check ATIS broadcast and include the message that “Low Visibility Procedures in Force”. If ATIS is not available inform aircrafts on VHF.
9.3 Actions by SSO
9.3.1 On receipt of “Initiating SP” from Tower Supervisor/Duty Officer, SSO will inform the Duty Officer, NAV AIDS and have the ILS equipment and its status indicators in ATC units checked up.
9.3.2 On receipt of “Initiating LVP” from Tower Supervisor/Duty Officer that LVP are to be made effective SSO will maintain continuous watch on the performance of ILS equipment.
9.3.3 He will inform Tower Supervisor/Duty Officer of any unserviceability in the equipment which is likely to affect Low Visibility operations.
9.4 Actions by Duty Manager (Airside)
9.4.1 On receipt of advice from Tower Supervisor/Duty Officer to implement Safeguarding procedure, the Terminal Duty Manager, will immediately inform the following:
i) CASO (State Office)
ii) All airlines/GHA.
iii) Civil In-charge
9.4.2 Duty Manager (Airside) shall ensure that-
9.4.2.1 No vehicle/person enters or is present in the sensitive/critical areas of localizer and glide path.
9.4.2.2 All civil/electrical works in progress are to be stopped in the manoeuvring area immediately and men/material/ equipment to be removed from the sensitive/critical areas of localizer and glide path.
9.4.3 Duty Manager (Airside) would advise Tower Supervisor/Duty Officer when all actions allocated to them are completed.
9.4.4 Subsequently, Duty Manager (Airside) shall remain available in apron and will maintain listening watch on Walkie-Talkie.
9.4.5 The vehicles which are not equipped with RT but has to enter the runway or taxiway for urgent operational requirement shall be escorted all the time.
9.4.6 Duty Manager (Airside) shall ensure that all the roads are closed during the Low Visibility Operations, except the Fire approach road and designated PDPs.
9.5 Actions by Shift In-Charge (Civil)
9.5.1 Shift In-Charge (Civil) to ensure that all civil works in progress in manoeuvring area, are stopped and that the work area is restored in complete serviceable condition and confirm to Tower Supervisor/Duty Officer accordingly.
9.5.2 Shift In-Charge (Civil) to ensure that during Low Visibility Operations, no equipment, manpower shall be present in sensitive areas of localizer and glide path.
9.5.3 Shift In-Charge (Civil) to ensure that none of the civil contract workers/vehicles shall enter the manoeuvring area during the Low Visibility operations.
9.6 Actions by Shift In-Charge (Electrical)
9.6.1 On receipt of advice to implement Low Visibility Procedures from Tower Supervisor/Duty Officer, will check that following visual aids are serviceable and can be operated at full intensity:
a) Approach lighting system
b) Runway edge lights
c) Runway threshold and end lights
d)Runway guard lights
e)Taxiway edge lights
(NOTE - No adjustment in light intensity shall be made without permission from ATC Tower during LVP)
9.6.2 Shift In-Charge (Electrical) shall ensure that no electrical maintenance works is carried out during LVP either in powerhouse or on any other electrical facilities used during Low visibility operations.
9.6.3 Shift In-Charge (Electrical) will ensure that Runway switch room is manned and position themselves at halls for ground lighting facilities.
9.6.4 Shift In-Charge (Electrical) will inform the un-serviceability or any change in status of any facility/systems to Tower Supervisor/Duty Officer immediately.
9.6.5 Shift In-Charge (Electrical) shall ensure the electrical personal is available in follow me vehicle for the AGL inspections before each departure during LVP implementation.
9.7 Actions by ARFF
9.7.1 Positioning CFTs as per visibility standby procedures.
9.7.2 ARFF/ CFTs must obtain clearances from Tower prior to entry to movement area.
9.8 Actions by Tower Met Officer (Meteorological Office)
9.8.1 Tower Met Officer would issue an 'Outlook for Low Visibility Procedures' to the Tower Supervisor/Duty Officer of air traffic services whenever he expects that the RVR and/or cloud ceiling will fall below 800 m and/or 200ft or less respectively.
9.8.2 Whenever Tower Met Officer visualizes that RVR is likely to fall below 800 m and/or cloud ceiling to 200ft or less within next 2 hours, he will inform to Tower Supervisor/Duty Officer to this effect.
9.8.3 When the RVR and/or cloud ceiling are 800m and/or 200ft respectively and the trend is towards improvement in these elements of weather conditions the Duty Met Officer may, when requested by Tower Supervisor/Duty Officer, advise him about such improving weather conditions for the purpose of termination of LVP.
9.8.4 The Tower Met Officer shall be present in Tower during periods of reduced visibility and ensure that the RVR displays in ATC units in the Tower and Approach Control are serviceable.
10. TERMINATION OF LOW VISIBILITY PROCEDURES
10.1 When Visibility/RVR improves to 800M or more and cloud ceiling is 200 feet or Higher and trend is for improvement, Tower Supervisor/Duty Officer Tower would terminate operations of LVP. He may obtain advice from Tower Met Officer regarding improvement in weather conditions before the termination of LVP.
10.2 On termination of LVP, following message shall be included in two subsequent ATIS broadcasts. “LOW VISIBILITY PROCEDURES TERMINATED”. If ATIS is not available inform aircrafts on VHF.
10.3 If SP are implemented and LVP are not subsequently implemented and the visibility/RVR improves and is more than 1200 m and/or the cloud ceiling is 400ft or higher and both are forecast to remain above the required SP criteria, Tower Supervisor/ Duty Officer Tower may cancel SP.
11.OTHER ACTIONS
11.1 Every year before commencement of monsoon/winter season, a meeting will be held by Airport Director, to inform all airlines and agencies operating at airport about their roles/responsibilities and create awareness to ensure co-operation for safe airport operations during periods of low visibility.
11.2 Before issuing the Airside driving permits, the OPS Incharge shall ensure that staff and drivers are suitably trained for Low Visibility operations.
11.3 All agencies operating in the operational area shall ensure that only those vehicles that are absolutely essential for aircraft operations operate in the operational area during periods of low visibility. The drivers of these vehicles should keep a look out for taxiing aircraft and other vehicles to prevent accidents.
11.4 All the vehicles must have their obstruction lights “ON” during Low Visibility Procedures operations.
11.5 A refresher program for ATCO’s and personnel responsible for airside operations shall be conducted every year.

VOBZ

AD 2.21

NOISE ABATEMENT PROCEDURES

NIL

VOBZ

AD 2.22

FLIGHT PROCEDURES

NIL

VOBZ

AD 2.23

ADDITIONAL INFORMATION

1. Take-off Run Available for Departures from Intermediate RWY Positions:

i. RWY 08:

a) From TWY A - 2589 M

b) From TWY B - 2867 M

c) From TWY D - 2240 M

ii. RWY 26:

a) From intermediate turn pad: 2286 M

2. Departure on RWY 26 from intermediate turn pad can be initiated by ATC with concurrence of pilot or as per request from

pilot.

3. Aircraft landing on RWY 08 can use intermediate turn pad for making 180 degree turn for runway vacation. Critical aircraft

A321.

4. ADS-B Commissioned with following Details:

i. FREQ: 1090MHz

ii. COORD: 16.528826N 80.793660E

iii. SITE ELEV: 61.728216 M/202.53 ft AMSL

5. Aircraft stands 15 and 16 are not available for night operations.

 

VOBZ

AD 2.24

CHARTS RELATED TO AN AERODROME

1.

Aerodrome Chart (02 OCT 2025)

2.

Aircraft Parking/Docking Chart (02 OCT 2025)

3.

Aerodrome Obstacle Chart-Type A (Operating Limitations) RWY 08 (12 JUN 2025)

4.

Aerodrome Obstacle Chart-Type A (Operating Limitations) RWY 26 (12 JUN 2025)

5.

Aerodrome Obstacle Chart-Type B (12 JUN 2025)

6.

ILS (Z) Procedure RWY 26

7.

ILS (Y) Procedure RWY 26

8.

Coding Table - ILS (Y) Procedure RWY 26

9.

VOR Procedure RWY 08

10.

VOR Procedure RWY 26

11.

RNP Procedure RWY 08

12.

Coding Table - RNP Procedure RWY 08

13.

RNP Procedure RWY 26

14.

Coding Table - RNP Procedure RWY 26

VOBZ

AD 2.25

VISUAL SEGMENT SURFACE (VSS) PENETRATION

Procedure

Procedure Minima

VSS Penetration

1

2

3